FORMERLY 160GLOW - NOW THRAXEL, LLC - SAME BROTHER FOUNDED & OPERATED COMPANY, NEW NAME AND BRANDING! HERE’S TO THE FUTURE!  •  
Landscape Lighting Permanent Lighting Christmas Lighting Gallery About Journal Service Areas Contact Get Your Free Quote

Year-round timing

The Western PA exterior lighting calendar, month by month

Every month in Western Pennsylvania carries a different lighting job, from spring landscape installs to January takedowns. Here is the calendar we actually run our crews on, season by season.

Home at dusk with permanent lighting tracing the roofline

Why the calendar matters more than the product

Western PA weather decides which lighting projects happen when, more than customer preference does. A permanent RGBWW system can go up almost any month the ground is not frozen solid, but Christmas lighting and landscape work follow tighter windows tied to frost, daylight and demand.

We get the same questions every month: is it too late for landscape lighting, is it too early to book Christmas, will permanent track survive an install in the cold. The answer changes with the calendar page, so here is the year laid out the way we actually run it.

That is also true for the businesses we work with. A restaurant weighing commercial lighting or an HOA planning a community entrance runs into the same seasonal logic homeowners do, just at a different scale. See thraxel.com/blog/off-season-lighting-planning/ for how the quieter months get used across every property type.

Late winter into spring: February through May

February and March are quiet on site but busy on the phone, as homeowners plan landscape lighting for patios, paths and trees ahead of spring gatherings. Once the ground thaws, landscape crews tend to move first, since fixture placement does not depend on leaf cover the way tree uplighting eventually will.

Permanent roofline installs restart here too. A property that got a render mock-up over the winter often turns into a spring install once weather allows a crew on the roofline for more than a single day at a stretch. See thraxel.com/permanent/ for what that system looks like once it is finished.

It is also the stretch where landscape and permanent projects sometimes compete for the same calendar weeks, since both wake up around the same time. Getting a consultation request in during February, before the spring rush actually starts, is the easiest way around that overlap.

  • February-March: consultations and render mock-ups
  • April: landscape and early permanent installs resume
  • May: patios and firepits back in the evening rotation

Summer: June through August

Summer is the easiest stretch on the calendar. Long days, workable ground and stable weather mean permanent installs move quickly, and most homes finish in one to two days start to finish. It is also the season homeowners see the payoff fastest, running a July 4th scene or a game day look the same week it goes in.

Landscape lighting keeps pace through summer as well, with pool decks, docks and outdoor kitchens getting wired while the family is actually out there after dark. See thraxel.com/landscape/ for the zones we cover.

Commercial and HOA properties often use summer for the same reason homeowners do: workable weather and enough daylight to finish a larger job, a plaza or a community entrance, without racing the calendar.

Early fall: September and October

September is when the Christmas calendar quietly opens, even though nobody is thinking about lights yet. It is still a strong month for permanent installs too, since the ground has not frozen and crews are not racing shorter daylight the way they will by December.

October keeps that window open a little longer. Both months get their own detail at thraxel.com/blog/why-september-is-the-month-to-book/ and thraxel.com/blog/october-permanent-lighting-installs/.

This is also when homeowners tend to compare options seriously, since the ground is still workable for a permanent install while the Christmas design queue fills at the same time. thraxel.com/blog/permanent-vs-seasonal-christmas-lights/ walks through how we help homeowners choose between the two before the fall rush picks up.

The Christmas stretch: November and December

November is install month for traditional Christmas lighting, and the good weekends fill first, so locking in a design early raises the odds of landing on one of them. Installs only happen when weather permits, which is why the calendar carries some built-in give.

December is when the display is up and running. Any problem, a bulb out, a wire a squirrel decided to test, gets a visit within 24 to 48 hours at no charge. It is a service month more than an install month.

Businesses and HOAs run a version of this same window too, since commercial holiday scenes need enough lead time to be locked before the surrounding neighborhood is already lit. A retail plaza or restaurant that waits until Thanksgiving week is choosing from the same shrinking pool of dates homeowners are.

January: the reset

Takedowns start January 4 as weather allows. Everything comes down, gets labeled by section and stored, ready to go back up the same way the following November. Permanent lighting owners skip this step entirely, which is one reason conversations about switching systems tend to happen right around January.

January is also when a lot of planning conversations start for the rest of the year, since the calendar itself is quiet even though the questions do not stop. A homeowner weighing permanent lighting against another season of seasonal service, or a business thinking ahead to a spring landscape upgrade, often starts that conversation here precisely because nothing else is competing for attention.

How to use this calendar

If you are planning any exterior lighting project this year, work backward from the season you want it finished by, not the season you happen to be thinking about it. A landscape project wanted for July should get a quote request in by spring. A Christmas display wanted for Thanksgiving needs a design locked before Halloween.

Every project starts the same way no matter the month: a free on-site consultation and a render mock-up of your actual property. Request one at thraxel.com/quote/.

The same logic applies whether the project is a single roofline or a multi-zone commercial property. Plan from the finish date backward, request the consultation early, and let the calendar work in your favor instead of against it.

FAQ

Questions people ask about this

Western PA exterior lighting follows a rough calendar: landscape lighting installs best in spring and fall, permanent roofline systems go up almost any month the ground isn't frozen, and traditional Christmas lighting installs in November with takedowns starting January 4. The busiest booking months are September and October, ahead of the good November weekends filling up first.
Mostly yes. Permanent RGBWW lighting can go in during almost any month Western PA ground isn't frozen solid, including summer, spring and early fall. Deep winter with hard frost is the main exception, since track mounting and wiring work best on a fully workable roofline. Most homes are finished in one to two days once the crew is on site.
Christmas light takedowns in Western PA start January 4, as weather allows. Crews remove the display, label each section, package it and store it until the following November, when it goes back up the same way. Homeowners with permanent lighting skip this step entirely, since that system simply stays on the house year-round.
Landscape lighting installs well in both spring and fall in Western PA. Spring is popular because homeowners want paths, patios and firepits lit before summer gatherings start. Fall works too, since the ground is still workable and the lighting is finished before shorter days make the yard dark by early evening. Deep winter with frozen ground is the tighter window.
Every phase of Thraxel's calendar, from permanent installs to Christmas lighting, only happens when weather actually permits it. If a scheduled date turns into an ice storm or a soaked yard, the crew reschedules for the next workable day instead of forcing an install. That flexibility is built into the calendar, which is why booking early leaves more room to work with.

Get your property on the calendar

Free consultation. Render mock-up within 48 hours. Installed in 1 to 2 days.

Get Your Free Quote

Or call Tyson: 724-859-4390

Free Quote Text / Call Tyson