FORMERLY 160GLOW - NOW THRAXEL, LLC - SAME BROTHER FOUNDED & OPERATED COMPANY, NEW NAME AND BRANDING! HERE’S TO THE FUTURE!  •  
Landscape Lighting Permanent Lighting Christmas Lighting Gallery About Journal Service Areas Contact Get Your Free Quote

For property managers

Architectural lighting for office parks with more than one building to manage

A single-tenant office building is a simple lighting decision. A multi-building office park is a coordination problem, matching architecture, keeping every building on the same schedule, and controlling all of it without a facilities team driving between properties at dusk.

Commercial install with architectural lighting at night

The coordination problem property managers actually face

Different buildings in the same park often have different tenants, different lease terms, and sometimes different exterior finishes, but they still need to present as one cohesive property to anyone driving through. Uncoordinated lighting, some buildings lit, others dark, undercuts that.

A shared architectural lighting standard, applied building by building but controlled from one system, solves the consistency problem without requiring every tenant to independently decide on their own exterior lighting.

Property managers juggling several tenants rarely have the bandwidth to negotiate lighting decisions building by building, and a patchwork of individually chosen fixtures usually looks like exactly what it is, several unrelated decisions rather than one managed property.

How the system scales across multiple buildings

Individually addressable RGBWW pixels in color-matched track apply the same way to an office park as to a single commercial building, just replicated across each structure, with every zone reachable from the same app rather than a separate controller per building.

Color-matched track disappears against building trim by day, which matters for office parks with strict architectural review standards or a management company that does not want visible equipment on the facade during business hours.

Every fixture on the property carries UL, ETL or CUL certification and runs on 16-gauge outdoor-rated wire in an IP67 marine-grade housing, the same components used on a single building scaled to however many structures the park has. A failed pixel on any building is diagnosed individually rather than triggering a broader troubleshoot across the property.

Zones extend the same way on every structure: rooflines, entrances, columns and signage, so a tenant's suite entrance gets the same lighting treatment as the building's main facade rather than being left as an afterthought.

  • One app controls lighting across every building in the park
  • Color-matched track keeps the daytime look unchanged
  • Zones cover rooflines, entrances, signage and columns building by building

Scheduling installation with active tenants on site

Office parks stay occupied during standard business hours, so installation is scheduled around tenant activity the same way it is planned around any operating commercial property, minimizing disruption to parking and building access during the workday.

A phased rollout, building by building rather than the entire park at once, is common for larger properties and lets the management company budget the project across more than one cycle if needed.

Crews install with proper PPE and only when weather cooperates, the same standard applied to a single-building commercial job, and no staples or fasteners go into roofing or fascia material regardless of how many structures are on the schedule that week.

Why architectural consistency matters for leasing

A well-lit, cohesive office park reads as better managed to a prospective tenant touring in the evening, the same way a well-lit home reads as better maintained to a homebuyer. It is a presentation detail, not a structural one, but it is visible on every drive-by.

Commercial service plans keep the system maintained across the property long after the initial install, which matters more for a multi-building site than a single structure.

A property that stays lit the same way every night, not just during a holiday push, reads as stable to a tenant evaluating a multi-year lease. Scene changes are available for a specific event or season, but the everyday warm-white look is what a prospective tenant actually sees on a typical evening drive-through.

Leasing agents touring prospects after dark benefit directly, since a well-lit approach and entrance sequence is often the first impression a tenant gets of the property, well before they see a suite interior.

Starting with a property-wide consultation

A free on-site consultation for a multi-building property covers the full park, with a render returned within 48 hours showing how the lighting standard applies across each structure. For projects at this scale, reach AJ directly at 240-730-4064.

Financing at 0% APR for up to 24 months is available for qualifying commercial buyers through Thraxel's financing partner, which spreads a property-wide rollout across a budget cycle rather than requiring the full project cost upfront.

FAQ

Questions people ask about this

Yes. The permanent RGBWW system extends across multiple structures on one property, with every building's zones, roofline, entrance, signage, columns, reachable from a single app rather than a separate controller per building. This keeps a multi-building site presenting consistently rather than building by building at random.
No. The aluminum track carrying the pixels is color-matched to building trim and sits tight against the fascia, making it effectively invisible during daylight hours. Office parks with strict architectural review standards typically have no issue with the daytime look, since there is no visible equipment change to the facade.
Yes, a phased rollout is common for larger properties, letting a management company budget the project building by building across more than one cycle instead of installing the entire park at once. Each phase still integrates into the same app-controlled system once complete.
Installation is planned around standard business hours and existing tenant traffic, similar to how any occupied commercial property is scheduled, to minimize disruption to parking and building access during the workday. The property's management company coordinates timing during the free consultation before any crew is on site.
No. A single consultation typically covers the entire property, with the render showing how the lighting standard applies to each building individually. Pricing reflects the full scope of the project, roofline footage, number of structures and zones covered, rather than being quoted building by building as separate jobs.

Coordinate lighting across your whole property

Free consultation. Render mock-up within 48 hours. Installed in 1 to 2 days.

Get Your Free Quote

Or call Tyson: 724-859-4390

Free Quote Text / Call Tyson