The calendar
Decorating timelines: what Western PA does between Thanksgiving and Epiphany
The holiday season on a Western PA calendar runs roughly six weeks, from the Thanksgiving weekend kickoff to takedowns that start January 4. Here is what actually happens, week by week, on a typical street.

Thanksgiving weekend: the unofficial start
Very few Western PA homes decorate before Thanksgiving. It reads as jumping the line. The weekend itself, though, is when boxes come down from the attic, trees get carried in from the garage, and the first porch lights of the season click on across most streets in the region.
For homes on a professional install schedule, this is also when the crew calendar tightens the most. The good November weekends book first, and a lot of that booking happens in October, well before the turkey, since demand consistently outpaces the number of usable weather days a crew can count on.
Households that wait until after Thanksgiving weekend to even start thinking about a display are not necessarily too late, but they are working with a shrinking pool of both good weather and available install dates as the calendar moves toward December.
The first two weeks of December
This is the heaviest install stretch of the year. Rooflines, porches, trees and window frames go up across every county in the footprint, weather permitting, and a cold snap can push an install a few days in either direction depending on how quickly conditions clear.
It is also when most indoor decorating catches up to the outdoor work, so by the second weekend of December a typical house is fully dressed, inside and out, for the rest of the month. Trees are trimmed, mantels are garlanded, and the exterior display is usually locked in by this point.
Crews working this stretch tend to run long days while daylight and weather allow, since the number of workable hours per day is already limited by December's short daylight and can shrink further if snow moves in.
Mid-December through Christmas Eve
Once everything is up, this stretch is maintenance, not installation. A bulb goes out, a squirrel gets into a wire on a tree, a windstorm knocks a strand loose. Thraxel's seasonal program covers exactly this window, with any reported issue fixed within 24 to 48 hours at no charge.
Traffic on the neighborhood display circuit peaks here too, as families make their annual evening drive past the best-lit blocks before the holiday itself arrives, and the streets that built a reputation earlier in the season get the most visitors in this final stretch.
The quiet stretch, December 26 through January 3
Displays stay up through this week almost everywhere in the region. Taking lights down between Christmas and New Year's is rare here. Most households treat the whole run through New Year's Eve as one continuous season rather than two separate holidays to decorate around.
This is also a low-activity week for install crews, since almost nothing new goes up and very little comes down, which makes it one of the quieter stretches on an otherwise packed seasonal calendar.
January 4 and the start of takedowns
Thraxel's takedown schedule begins January 4, as weather permits, which lines up with when most families are ready to see the lights come down too. Lights are removed, labeled and packaged for storage rather than left tangled in a bin somewhere in the garage until next year.
Some households keep a single string lit past that point, often tied to a personal Epiphany or Twelfth Night observance in early January, but by mid-month the rooflines across most of the footprint are bare again until the following November.
Takedown season, like install season, is weather dependent, so a stretch of ice or heavy snow in early January can push a scheduled removal back a few days, the same constraint that shapes the install calendar in reverse.
- Thanksgiving weekend: attic boxes come down, install season books solid
- First two weeks of December: the heaviest install stretch
- Mid-December to Christmas Eve: maintenance, not new installs
- December 26 to January 3: lights stay up, the season keeps running
- January 4 onward: takedowns begin as weather allows
Planning around the calendar, not against it
The households that get the smoothest season are usually the ones that plan around this timeline rather than fighting it, booking a consultation well ahead of Thanksgiving and expecting takedown to happen on its own schedule in early January rather than immediately after Christmas Day.
A permanent lighting system sidesteps most of this calendar entirely, since nothing needs to be installed or removed each year. For anyone tired of working around six weeks of weather-dependent scheduling every winter, that is one of the more practical reasons to make the switch.
Even for households that stick with a seasonal display, understanding this six-week rhythm in advance tends to lower the stress of the whole season. Knowing that a late-November booking is normal, that maintenance calls are expected and covered, and that January 4 is when takedown starts rather than immediately after Christmas, sets realistic expectations from the start.
It is also worth noting that the timeline shifts slightly by county and elevation. Homes at higher elevation or further north in the footprint can see their usable install window compress a little earlier than homes closer to the river valleys, which is one more reason to book on the early side rather than the late side of any given week.
Why the calendar rewards planning ahead
None of these windows are officially posted anywhere, they are simply the pattern that has held across seasons of professional install work in the region. A household that internalizes the rhythm, booking in September or October, expecting install in the first two weeks of December, and expecting takedown in early January, tends to have a far smoother season than one that tries to fit a display into whatever week happens to be convenient.
That is true whether the household hires a crew or handles the display themselves. Weather does not care who is on the ladder, and the compressed window between Thanksgiving and the first hard snow applies equally to a DIY install and a professionally scheduled one.